MIL-G-80048C
4.2 First article inspection When first article approval is required
under 3.1, first article inspection shall be performed. Unless otherwise
specified (see 6.2.1), first article inspection shall comprise the
examination in 4.4 and all tests in 4.5. Failure to pass the examination
or any part of the test shall be cause for disapproval of the first
article.
Quality conformance inspection
4.3
Quality conformance inspection.
shall be applied to each item prior to being offered for acceptance under
the contract. Unless otherwise specified (see 6.2.1), quality conformance
inspection shall consist of the examination in 4.4, the test in 4.5.1 and
the inspection in 4.6. Failure of an item to pass any examination or test
shall be cause for rejection.
The machine and equipment shall be examined for
4.4
Examination.
compliance with the requirements in 3.2 through 3.6 and 3.9 through 3.19.
4.5 Tests.
4.5.1 Operational tests. The machine shall be operated at no load for
Proper operation of all controls, motors.
not less than 60 minutes.
adjusting mechanisms and other accessories shall be verified during the
trial period.
Each machine shall be tested by grinding 3
4.5.2 Performance tests.
rods from C-1045 steel. For size 1 machines, each rod shall be 1 inch "n
diameter by 3 inches in length. For size 2 and 3 machines, each rod shall
be 2 inches in diameter and 4 inches in length. For size 4 machines, each
The. grinding
rod shall be 4 inches in diameter by 6 inches in length.
wheel and machine settings shall be at the discretion of the supplier.
After
Stock removal shall be not less than 0.010 inch on the diameter.
grinding, end-to-end variation in diameter measurement shall not be more
than .0002 inch at any point, with a surface finish not rougher than 30
micro-inches.